Standby Electrical Generator Technology Workshop Day
Event Date: 05/17/2007
READING ELECTRIC in Partnership with BALDOR, Cummins/Onan and Briggs &
Stratton is pleased to extend this Invitation to you for our upcoming “Standby Electrical Generator Technology Workshop”. This Workshop will feature some of the latest Electrical Generating Equipment Technology, and we will have Manufacturers
Representatives and equipment on-site to address your questions and needs. The
Workshop will consist of both classroom sessions and live demonstrations.
THIS WORKSHOP IS OFFERED TO YOUR COMPANY AT NO COST.
WHO SHOULD ATTEND: This event will benefit those Management, Architectural, Engineering and Technical Personnel responsible for specifying, designing, installing and managing Standby Power Systems. You will have the opportunity to ask questions of the READING ELECTRIC and OEM FACTORY Experts about your Generator system requirements. The classroom sessions will focus on the following topics relating to the Generator Systems:
Morning Session (9:00 am to 12: 00 pm)
- Generator Sizing Pitfalls and the Cummins sizing program
- Newest Generator Technologies from Cummins / Onan
- Newest Residential Generator Display from Briggs & Stratton
Afternoon Session (1:00 pm to 3:00 pm)
- Current EPA Emissions and what is in the future
- Newest Generator Technologies from Cummins / Onan
- Newest Residential Generator Display from Briggs & Stratton
WHEN & WHERE: The Seminar will be held in the READING ELECTRIC Facility on Thursday, May 17, 2007 from 9:00 am to 3:00 pm. A light lunch will be provided. Make your reservation as soon as possible, as space is limited. FAX (610.929.1670) or complete the form below. Upon receipt of your reservation, additional scheduling details and directions will be forwarded.
Technical Seminars
10/14/2010
THE SEPTEMBER 30TH WORKSHOP IS AT CAPACITY,
PLEASE CONSIDER ATTENDING THIS WORKSHOP ON OCTOBER 14TH
Motor Starters and Controls
Determining Failure Modes and Servicing Tips
07/22/2010
Motor and Pump FailuresDetermining Failure Modes, Repair Tips and ACT 129 Incentives
Special Case Study Presentation byWestern Berks Water Authority
View all seminars »
In The News
01/11/10
Reading Electric and Borrego Solar secure 7.5M for 32 companies
07/07/09
Solar Energy Grant Program funding





