Generators and UPS Systems
Event Date: 08/20/2009What can and can't they do!
READING ELECTRIC is pleased to invite you to this Technical Workshop focusing on the Pros & Cons of Generators / UPS and what issues can and can't be resolved by their utilization.
THIS WORKSHOP IS OFFERED TO YOUR COMPANY AT NO COST.
WHO SHOULD ATTEND: This Workshop will benefit those Management, Architectural, Engineering and Technical Personnel responsible for specifying, designing, installing and managing your Critical Power System. You will have the opportunity to ask questions of the Reading Electric Experts about your system requirements. The Workshop will focus on the following aspects of Generator and UPS Systems:
Generators - The Pros and Cons UPS - The Pros and Cons
Engine and Fuel Types UPS Types
Engine Controls Battery Options
Voltage Regulation Typical Operation Modes
Generator Excitation Common Design Mistakes
Transfer Switches
Typical Operation Modes
Common Design Mistakes
Generators - The Pros and Cons UPS - The Pros and Cons
Engine and Fuel Types UPS Types
Engine Controls Battery Options
Voltage Regulation Typical Operation Modes
Generator Excitation Common Design Mistakes
Transfer Switches
Typical Operation Modes
Common Design Mistakes
Technical Seminars
10/14/2010
THE SEPTEMBER 30TH WORKSHOP IS AT CAPACITY,
PLEASE CONSIDER ATTENDING THIS WORKSHOP ON OCTOBER 14TH
Motor Starters and Controls
Determining Failure Modes and Servicing Tips
07/22/2010
Motor and Pump FailuresDetermining Failure Modes, Repair Tips and ACT 129 Incentives
Special Case Study Presentation byWestern Berks Water Authority
View all seminars »
In The News
01/11/10
Reading Electric and Borrego Solar secure 7.5M for 32 companies
07/07/09
Solar Energy Grant Program funding





